SPEC provided project development, engineering, permitting, drafting, procurement support, and construction support for the additive of a new customer gasoline additive injection system at 17 distribution terminals across the United States. SPEC’s tasks included assisting in the definition of the overall project scope, permitting, modification of existing additive systems, installation of new additive systems (i.e. injectors, pumps, injection points, piping, tubing, etc.), and design and installation of new additive tanks. SPEC design and project scope allowed for distribution terminals to handle roll out of new gasoline additive across the United States.
Services Provided: Project Development, Engineering, Design, Procurement, Permitting, Construction Support
Client: Major Oil Company
Project Location: 17 Terminals AcrossUSA
Project Length: Two years
SPEC Project Team Size: 15